aboutsummaryrefslogtreecommitdiff
path: root/sem4/embedded/eksamnen/M7opg.adoc
diff options
context:
space:
mode:
authorJulian T <julian@jtle.dk>2020-06-07 23:40:14 +0200
committerJulian T <julian@jtle.dk>2020-06-07 23:40:14 +0200
commit6075c41624efa8260344dfd4b0c7fa563f4cfe5e (patch)
tree0ee0942543935c70ddd108f71562612cdd72daee /sem4/embedded/eksamnen/M7opg.adoc
parent6cb9bec1e0241fe64afdad9a520f026a9c25ea91 (diff)
Added solutions for many of the first exercises
Diffstat (limited to 'sem4/embedded/eksamnen/M7opg.adoc')
-rw-r--r--sem4/embedded/eksamnen/M7opg.adoc17
1 files changed, 2 insertions, 15 deletions
diff --git a/sem4/embedded/eksamnen/M7opg.adoc b/sem4/embedded/eksamnen/M7opg.adoc
index c4b32f6..4be491a 100644
--- a/sem4/embedded/eksamnen/M7opg.adoc
+++ b/sem4/embedded/eksamnen/M7opg.adoc
@@ -16,21 +16,8 @@ ____
_Does utilization guarantee feasibility of an RMA schedule?_
____
-
-Først regner jeg utilization ud.
-
-----
-U = 20/50 + 20/80 = 0.65
-----
-
-Derefter kan man regne utilization critereon ud.
-
-----
-\overline{U} = 2 * (2^(1/2) - 1) = 0.82
-----
-
-Her kan man garantere at RMA er schedulable.
-
+Nej det kan man ikke.
+Hvis deadlines havde været samme som periode kunne man regne stem:[\overline{U}] ud.
____
_Validate an RMA schedule with the exact schedulability criterion._
____